From Contact 65:
The work on the new cemetery is continuing. At the moment both drinking and non-potable water supplies are being installed, and the road is being constructed. In order to keep costs down at this stage, the front of the cemetery will be walled, the rest of the perimeter will be fenced. There will be a reception area at the entrance. The cemetery will be divided into five sections: three for Orthodox burials, one for EU burials, and one section for other burials.
It is hoped the cemetery will be ready by the end of the year.